{"product_id":"1041648r","title":"1041648R Nordyne Control Board OEM","description":"\u003ch1\u003e1041648R Nordyne Control Board OEM\u003c\/h1\u003e\n\u003ch2\u003e\u003cspan style=\"background-color: rgb(255, 255, 0);\"\u003e\u003cstrong\u003eNormal stocking item \u003c\/strong\u003e\u003c\/span\u003e\u003c\/h2\u003e\n\u003ch2\u003eProduct Overview\u003c\/h2\u003e\n\u003cp\u003e\u003cspan\u003e1041648R is a genuine OEM integrated control board designed for Nordyne MG1E and MG2R series gas furnaces. It governs all ignition sequences, blower functions, safety interlocks, and diagnostic LED displays. This board is specified for units manufactured after July 4, 2022, ensuring compatibility with the latest furnace revisions.\u003c\/span\u003e\u003c\/p\u003e\n\u003cdiv class=\"relative pb-6 w-full after:border-b after:border-stroke-300 after:w-full after:absolute after:mt-3\"\u003e\u003cbr\u003e\u003c\/div\u003e\n\u003ch2\u003eCross-Reference Part Numbers\u003c\/h2\u003e\n\u003cdiv\u003e\n\u003cdiv\u003e\n\u003ctable\u003e\n\u003cthead\u003e\n\u003ctr\u003e\n\u003cth\u003eOEM Part Number\u003c\/th\u003e\n\u003cth\u003eCross-Reference \/ Emerson Part Number\u003c\/th\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003e1041648R\u003c\/td\u003e\n\u003ctd\u003eEmerson 50X57-160-02B1\u003c\/td\u003e\n\u003ctd\u003e\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"pointer-events-none absolute inset-0 rounded-lg border border-stroke-300 dark:border-stroke-450\"\u003e\u003cbr\u003e\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv\u003e\u003cbr\u003e\u003c\/div\u003e\n\u003ch2\u003eCompatibility\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eNordyne MG1E and MG2R series gas furnaces built after July 4, 2022\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli class=\"ps-2\"\u003e\n\u003cp\u003e\u003cspan\u003eIntertherm and Emerson-branded units using the 50X57-160-02B1 platform\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003ePartners Choice\/Nordyne replacement boards in new FER-style furnaces introduced after July 2022\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cspan\u003eAlways confirm the furnace’s data plate manufacturing date before ordering.\u003c\/span\u003e\u003c\/p\u003e\n\u003cdiv\u003e\u003cbr\u003e\u003c\/div\u003e\n\u003ch2\u003eTechnician Notes\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eDe-energize electrical and gas supplies; lock out\/tag out per safety procedures.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003ePhotograph or diagram all wiring harnesses, dip-switch settings, and jumper positions before removal.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eWear an ESD wrist strap and handle the PCB by its edges to prevent static damage.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eVerify 24 VAC at the R and C terminals prior to powering up.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eObserve LED blink codes on startup; refer to the OEM code chart for fault diagnostics.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eInitiate a heat call and confirm proper ignition, inducer operation, and blower sequencing.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eReseat connectors and inspect solder joints if intermittent faults occur.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eReplace the onboard fuse and any aged wiring as recommended in the service manual.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cdiv\u003e\u003cbr\u003e\u003c\/div\u003e\n\u003ch2\u003eAdditional Resources\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eOEM wiring diagram \u0026amp; installation manual (PDF)\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003ePrintable cross-reference cheat sheet for MG1E\/MG2R control boards\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eStep-by-step video tutorial: 1041648R board replacement\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Neuco","offers":[{"title":"Default Title","offer_id":40298062512194,"sku":"1041648R","price":192.48,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1071\/8320\/files\/1041648r_nordyne_partshnc.png?v=1739507620","url":"https:\/\/hvacpartstore.com\/products\/1041648r","provider":"HVACpartstore","version":"1.0","type":"link"}